TD-005ÉlevéFournisseurPréventif
Plan de surveillance du système
La documentation technique doit inclure un plan décrivant les mesures de surveillance du système d’IA en exploitation, les données à collecter, les seuils de performance et les procédures de réponse aux écarts de performance.
Articles:Article 11(1)Article 72Annex IV §9
Exemples de preuves
- Operational monitoring plan
- KPI threshold definitions
- Deviation response procedure
Normes
ISO 42001:2023 §9.1
Contrôles associés
- TD-001AI System Description and General InformationArticle 11 and Annex IV require that technical documentation includes a general description of the AI system covering its intended purpose, the persons…
- TD-002Design Specifications and ArchitectureProviders must document the overall design logic of the AI system, including the algorithms and associated design choices, the key design parameters, and…
- TD-003Development Process DocumentationTechnical documentation must describe the methods and steps performed for the development of the AI system, including data collection, labelling, model…
- TD-004Validation and Testing Approach DocumentationProviders must document the validation and testing procedures applied to the AI system prior to placing it on the market, including the metrics used, the…
- TD-006Accuracy Metrics and Performance DocumentationProviders must document the accuracy, robustness, and cybersecurity metrics for which the high-risk AI system was designed and the relevant testing…
- TD-007Known Limitations DocumentationArticle 11 and Annex IV require explicit documentation of known or foreseeable limitations of the AI system, including performance degradation conditions,…
Termes associés du règlement sur l’IA
- Post-Market MonitoringProactive collection and review of experience gained from the use of high-risk AI systems, to identify any need for corrective or preventive actions and ensure continued compliance throughout the system lifecycle.
- Technical DocumentationThe documentation that providers of high-risk AI systems must draw up before placing the system on the market, containing all necessary information to assess compliance with the Regulation, including a general description, design specifications, training data information, risk management records, and performance metrics. Content requirements are set out in Annex IV.
Passez à la vitesse supérieure quand la conformité doit être
Le questionnaire gratuit fournit des signaux préliminaires. L'Évaluation Complète transforme les données réelles de vos systèmes en un dossier de décision gouverné : extraction, séparation des composants, preuves, surcouches nationales et dossier prêt à être audité.
Démarrer l'aperçu gratuit des risques